To perform an ammeter check during your run up, put a load on the electrical system (eg. Turn on all lights, flaps up and down, etc.) rather than shutting off the alternator side of the master switch.  Using the switch to test could cause a surge in the system that has the potential of damaging sensitive electrical systems in the aircraft.